News Roundup: Halfway

  • The first D-Line lift in New Zealand won’t be built this summer after all and The Remarkables will place 60 containers of lift parts into storage until government approval comes through.
  • A little ski resort in Labrador has as many new lifts as Whistler Blackcomb this winter – three!
  • A proposed gondola in Oakland would generate hundreds of millions of dollars in economic benefits, says a new study.
  • Two workers fall to their deaths during a practice evacuation of a new gondola in India.
  • A Swiss aerial tramway will be out of service for months following an avalanche that damaged a support tower.
  • Sleeping Giant experiments operating without a general manager.
  • Waterville Valley explains why some of its lifts are out of service.
  • Recently closed Vermont area Plymouth Notch goes up for sale along with its 1964 Mueller double.
  • The old  high speed quad from Horseshoe, Ontario is still available.
  • Faced with the possibility of losing its operating lease completely, Sunshine Village reluctantly agrees to new guidelines that remove the proposed Goat’s Eye tramway, Bye Bye Bowl expansion and Wildside lift from future consideration.  A second lift in the existing gondola corridor, Goat’s Eye II, Lookout, Hayes Hill and Lower Meadow Park expansions are still possible.
  • Environmental groups and Squaw Alpine are still sparring over the proposed California Express gondola.
  • Resorts across the Pacific Northwest come to the aid of Hurricane Ridge season pass holders, who lost a month of their season due to the government shutdown.
  • Rain delays the debut of Spider Mountain, the seventh lift-based destination for Mountain Capital Partners.

2 thoughts on “News Roundup: Halfway

  1. Florber January 26, 2019 / 6:38 pm

    I wonder if the Oakland Gondola would have the circular towers in the rendering, or just regular tube towers

    Like

Leave a reply to Florber Cancel reply