This is an archived list of new lifts built in North America during the 2021 construction season.
Blue = Doppelmayr
Yellow = Leitner-Poma
Green = Skytrac
Red = MND Ropeways
Purple = Partek
Orange = SkyTrans
Gray = Re-installations (used lifts)
White = To be announced
ATW = Aerial Tramway
CL = Chairlift
G = Gondola
SL = Surface lift
D = Detachable
F = Fixed grip
M = Monocable
P = Pulse
J = Jigback
The two Catamount chairs were never completed, should they be moved to 2022…..?
LikeLike
I’ll probably just leave them as they were mostly constructed in 2021. The quad at Mt. Baldy, ON also isn’t completed but towers and terminals are standing. Not a great year for used lift installations.
LikeLiked by 1 person
Honestly not an amazing year for installations at all. At least not 2020 though.
LikeLike