Park #4 – China Peak, CA The bottom terminal is located in the woods behind the loading zone. Load at T2. The sheaves can be raised or lowered for snow depth. Tower 1 is also before loading. Near the top. Breakover towers. View of the lift line. Fixed drive up top. Unloading ramp. Share this:EmailTwitterFacebookLike this:Like Loading...
Utah Powder Skier October 21, 2020 / 10:56 am Caples Crest at Kirkwood is another triple with flyover loading, but it was originally installed as a double. LikeLike
skier72 October 21, 2020 / 12:18 pm Solitude at Squaw Valley is another triple that has a flyover loading point. https://liftblog.com/solitude-squaw-valley-ca/ LikeLike
ne_skier October 21, 2020 / 1:58 pm Black at Magic had one of these, although it was originally constructed as a double LikeLike
New England Chairlifts & Skiing October 21, 2020 / 2:15 pm The Knome’s Knoll Triple at Pico, VT has one, and it was built as a triple and always has been. LikeLiked by 1 person
I’ve never seen a flyover load on a triple before.
LikeLike
Caples Crest at Kirkwood is another triple with flyover loading, but it was originally installed as a double.
LikeLike
Solitude at Squaw Valley is another triple that has a flyover loading point.
https://liftblog.com/solitude-squaw-valley-ca/
LikeLike
Black at Magic had one of these, although it was originally constructed as a double

LikeLike
The Knome’s Knoll Triple at Pico, VT has one, and it was built as a triple and always has been.