This is the original lift built at Big Powderhorn in 1964, though the drive terminal was probably a vault at that time.Drive station.Bottom bullwheel.View up the lift line.Looking back down.Top tension terminal.Because this lift is older, it does not have bullwheel unloading.Counterweight.Breakover towers.This lift runs parallel to Chair 5, though that lift starts higher and ends higher.Top terminal behind the unloading area.View down the line.