Bear – Manning Park, BC

This Doppelmayr Alpen Star quad replaced a Murray-Latta double in 2019.
Overview of the bottom terminal and lift line.
View up from the old bottom terminal location.
Sheave assemblies connected to the bottom station.
Loading area.
Middle section of the lift line.
Towers 1 and 2.
Lower lift line.
One of two steep sections of the line.
T9.
Top terminal.
Unloading area and Doppelmayr operator house.
A heavily loaded tower 12.
T13 and the top station.
Some of the tower foundations are square while others are round at the top.
View down at tower 10.
Flat section about half way up.
Depression assemblies.
Upper part of the lift line.
View of the base area.
You can see the foundations for the old Orange chair above tower 1.
A tower with different sheave assemblies on the light and heavy sides.

One thought on “Bear – Manning Park, BC

  1. skier72 November 11, 2019 / 7:07 am

    Such a beautiful lift.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s