BIG Express – Big Snow American Dream, NJ

This chairlift was the first to open indoors in the United States.
Doppelmayr CTEC Sprint bottom terminal.
The top terminal with no operator house.
The upper station also doubles as an emergency exit.
All of the lift’s towers come down from the ceiling.
Riding up the line.
Tower 5.
Arriving at the top.
The lift services a blue square run and black diamond terrain park.
Loading area.
Upper part of the lift line.
Tower 3.
Middle section of the line.
Unloading area.
View up from the base area.
The bottom terminal next to the entrance.
Drive operator house.
A platter lift runs next to the quad.
Last span on the line.
View up at tower 2.
Catwalk to a tower.
Drive bullwheel and motor room.
Lift overview.
Base area.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s