Camp Boule Express – Le Massif, QC

The Camp Boule Express replaced a double chairlift in 2004 and reused its tower tubes.
Towers near the bottom terminal.
Side view of the Uni-G station.
Loading area and operator house.
Lower terminal overview.
Leaving the return station.
Tower 11.
Arriving at the drive station.
This is the highest lift-served point on the mountain.
View down the lift line.
Middle part of the lift.
Side view of the top station.
Doppelmayr Worldbook entry.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s