Cascade – HoliMont, NY

This is one of two similar lifts built by CTEC at HoliMont, though the other one was replaced by a detachable quad.
View from the top.
Orion top station.
The last tower and top terminal are quite high off the ground.
View down the line.
Tower 8.
The bottom terminal and tower 1.
Lift overview.
Loading area.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s