This classic Poma double was the first chairlift built at Timber Ridge.The lift line is short and runs parallel to a Hall double chair.Loading area at tower 1.The final two towers.View back down the lift line.Floating return bullwheel.Top station overview.Early combo tower.Side view of the drive station.
Do they alternate schedules between the two lifts like sometimes the poma runs and sometimes the hall runs?
LikeLike