Chair 2 – Trollhaugen, WI

Trollhaugen built this Partek quad in house for the 2021-2022 season.
A Hall double used to run in this alignment.
Galvanized towers and chairs along the line.
Towers 6, 7 and the top terminal.
View down the line.
Looking up the line.
The lone hold down tower and lower lift line.
Uphill end of the drive station.
Lift overview.
Loading area.
View up the lift line.
Drive terminal side view.
Unloading area overview.

3 thoughts on “Chair 2 – Trollhaugen, WI

  1. Sam Shirley February 3, 2022 / 12:13 pm

    Interesting guides on the lifting frames for the wiring to the brittle bars. I don’t think I’ve seen that before.

    Like

    • pbropetech May 7, 2022 / 8:12 pm

      Looks like small pieces of conduit welded to the gantries. Seems to work.

      Like

  2. Mi_skier May 6, 2022 / 9:40 pm

    did they really spend the money on this just to not use it while the 45 year old center pole quad next to it still runs daily? looks like it was closed from the photos, and I really can’t understand why such a small hill would build a new lift like this for a backup/reliever.

    Like

Leave a Reply to Sam Shirley Cancel reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s