This is the main lift on the front side of the mountain and it replaced a Heron double chair in 1981.The line.Drive/tension tri leg terminal.Bottom station seen from above.At one point the light side skips three half towers that only support the heavy side.Lower lift line.Fun with towers.The top breakover.Height adjustable top station with fixed return.The unload.View down from the summit.Loading area and operator house.View down near the summit.
As per a photo on Dodge Ridge’s Facebook page, this lift received safety bars with no footrests over the summer.
LikeLike
Summer foot traffic and mountain biking operation. Bike carriers also installed later in the summer.
LikeLike