Chair 3 – Mission Ridge, WA

Mission Ridge Summer 05 075
Vault drive.
Mission Ridge Summer 05 093
View up at tower 15.
Mission Ridge Summer 05 094
Angled tower.
This lift is one of four bottom drive, top tension Riblet doubles built at Mission Ridge.
Vault drive building.
View up the lift line.
The first few towers.
Middle section of the line.
View down line.
Upper part of the line.
Top tension station.
Unloading at tower 22.
Lift line overview.
Bullwheel and tension carriage.
Unloading ramp below the top bullwheel.

2 thoughts on “Chair 3 – Mission Ridge, WA

  1. iloveribletdoubles March 29, 2021 / 10:25 pm

    I don’t think those hangers are the standard center-pole Riblet hangers.

    Like

    • Joe Blake July 25, 2021 / 4:52 pm

      Which one? There’s at least two styles on this chair. Also, as a bike mechanic, I hafta ask what is “standard”?

      Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s