So i know that Superior Tramways still sells Riblet parts, but I’m surprised that they haven’t tried to get in on the small ski area lift replacement market. Do they have rights issues fabricating full chairlifts?
Because this new bottom terminal and those lifting frames are definitely Riblet designs, and I’m assuming SkyTrac fabricated them?
Superior only seems to fabricate less bulky parts these days- sheaves, clips, assemblies, and so forth. They also produce Heron parts (we have to go through them for our Pitchfork lift and it takes a bit) They may not have a facility large enough to build entire lifts.
The lifting frames are custom- Riblet never made any like that. Any that you’ve seen like this have been added by the ski area or a contractor. Also, that’s an original Riblet return, Skytrac just added the tensioning.
The rear column, tension system components and lifting frames were fabricated and installed by the ski area. Tension system electrical and cylinder were supplied by Skytrac.
Replacing an old Riblet with another old Yan/Riblet/Doppelmayr. Interesting.
LikeLike
It might be more compact and parts are more readily available.
LikeLike
I believe this is what’s left of Cold Springs and Sunnyside from Sun Valley
LikeLike
Only Cold Springs lift parts
LikeLike
Does anyone know the reasoning behind making the fast switch key-operated here?
LikeLike
Makes it more difficult to inadvertently hit a fast when the other terminal wants the lift to stay slow. Same reasoning as the start key.
LikeLike
The only place I’ve seen those lifting frames is on Chair 4 at White Pass. Weird to see brand new ones on this lift.
LikeLike
So i know that Superior Tramways still sells Riblet parts, but I’m surprised that they haven’t tried to get in on the small ski area lift replacement market. Do they have rights issues fabricating full chairlifts?
Because this new bottom terminal and those lifting frames are definitely Riblet designs, and I’m assuming SkyTrac fabricated them?
LikeLike
Superior only seems to fabricate less bulky parts these days- sheaves, clips, assemblies, and so forth. They also produce Heron parts (we have to go through them for our Pitchfork lift and it takes a bit) They may not have a facility large enough to build entire lifts.
The lifting frames are custom- Riblet never made any like that. Any that you’ve seen like this have been added by the ski area or a contractor. Also, that’s an original Riblet return, Skytrac just added the tensioning.
LikeLike
The rear column, tension system components and lifting frames were fabricated and installed by the ski area. Tension system electrical and cylinder were supplied by Skytrac.
LikeLike
Copy. I bet it was easier to design a new rear mast than to modify the old one.
LikeLike
Nubs nob Michigan has a lift that was scrapped together by superior
https://liftblog.com/gray-nubs-nob-mi/
LikeLike
What a great looking lift.
LikeLike
This chair has been named Clementine according to their most recent trail map
LikeLike
Per an interview with Tim Cohee on The Storm Skiing Podcast this lift will be upgraded to a quad using parts from lift 4 at Taos.
LikeLike
Not this year
LikeLike