Chief – Nashoba Valley, MA

This Borvig triple services the skier’s right side of the mountain.
Side view of the drive station.
Top station with snowflake bullwheel.
Breakover towers.
Another view of the return.
View down the short lift line.
Tower 2.
This lift received new chairs in 2020.
Drive station.
Lift overview.

2 thoughts on “Chief – Nashoba Valley, MA

  1. Nate April 28, 2021 / 9:40 am

    This line has an incredible amount of haul rope sag in it, even on the counter-clockwise side (photos 6, 7, 8). Is it just me who sees this? Like isn’t that dangerous? Hope they re-spliced it after these were taken.

    Like

    • Calvin April 28, 2021 / 10:41 am

      It is a low tension lift as it is short with little vertical. But these are summer pics with the lift de-tensioned.

      Like

Leave a comment