The upper section of Eglise opened a year before the lower and includes a small cabin maintenance facility at the return terminal.Top station overview.View down from the summit and tower 21.The lift line has lots of ups and downs along its 6,300+ feet.A UNI-G-M terminal.View down the middle part of the lift line.A few sections are completely flat.Steepest part of the line.Lower lift line.View of Stage 1 from the first part of Stage 2.The drive terminal with Lone Peak in the background.Side view of the bottom terminal, which is also the top terminal for the first stage.Loading area with cabins transiting between sections.Side view of the return terminal.The cabin maintenance facility next to the station.A cabin arrives at upper Eglise.View down from near the summit.Tower 19.Most of the lift line seen from tower 15.A CWA Omega IV 8 LWI.The light side of the mid-station.Downhill loading area.View up from the intermediate station.A cabin in station with doors open.Control pedestal outside.The top terminal next to sister lift Great Bear.The lower station seen from above.
Great shots Peter!
LikeLiked by 3 people