Face Lift – Whiteface, NY

Face Lift replaced a CTEC triple and is the main lower mountain lift.
Towers 1 and 2.
The drive station seen from Cloudsplitter.
Departure side of the bottom station.
Lower part of the lift line.
A tower set right into a stream. 1,976 might refer to the elevation.
The middle part of the line.
Uni-G upper terminal.
Side view of the return.
Unloading area.
Another look down the line.
The entire lift seen from Whiteface Mountain.
Top station and last tower from Lookout Mountain.
Near the bottom terminal.
View up the line.
Tower 3.
Lift line overview.
Side view of the drive.
Doppelmayr Worldbook entry.
Advertisements

2 thoughts on “Face Lift – Whiteface, NY

  1. Muni October 16, 2018 / 2:35 am

    I remember “1976” being cast into the concrete base of the stream in the original tandem lift (which was built in 1976). That said, the stream tower is awfully close to the 2000′ topo line in google maps …

    Like

    • Collin Parsons October 16, 2018 / 5:11 am

      I believe that footing was reused from the original double-double which was installed in 1976.

      Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google+ photo

You are commenting using your Google+ account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s