This lift replaced a Hall double that had a major rollback the winter before construction.There was a Hall triple that ran parallel to this lift for its first few seasons.Riding up the line.Upper part of the lift line.View back down.Tower 15.Top terminal with hydraulic tensioning.The lift shack is behind the top terminal.Upper part of the lift.Lower lift line.Side view of the bottom station.Uni-Star drive station.