This lift replaced a double chair in 2007.CTEC chairs.Doppelmayr tower.Middle part of the lift line.Steep section of the line.View down.Upper lift line.Doppelmayr Canada drive terminal.Upper station unloading area.Uphill end of the drive terminal.View from the summit.This station is fixed with no tensioning.View down near the summit.Tower 1.Lower station with hydraulic tensioning.Loading carpet.Lift overview.Doppelmayr Worldbook entry.