This six place detachable replaced a quad and two T-Bars.Side view of the Uni-G drive terminal.The lift line is relatively short with a very consistent pitch.Lift overview.Loading area.Rare detachable loading carpet.Arriving at the return terminal.Unloading ramp.Side view of the top terminal.Upper part of the lift line.View down the line.Tower 3.The bottom terminal.Another view of the drive station.Tower 1 just outside the trumpets.
I think this lift directly replaced a quad and a T-Bar, both of which shared towers in a really funky way.
LikeLike
Is this the one:
LikeLiked by 1 person
One of the that’s went to Ascutney Vermont.
LikeLike
Leitner built this style a few times in Italy. I rode this one last spring: https://www.remontees-mecaniques.net/bdd/reportage-tsf2-san-rocco-leitner-6493.html
LikeLike