Lift 1 – Taos, NM

In 2018, this Leitner-Poma high speed quad replaced two fixed grip chairlifts out of the base village.
The new lift was built by Leitner-Poma.
Tower 1 adjacent to the bottom terminal.
View up the very steep lift line.
Riding up at tower 9.
Breakover towers near the top terminal.
Flat section at the top.
Terminal under skin and tower 14.
Upper station and the last tower with combo assemblies.
Upper part of the lift line.
Return terminal with a small maintenance rail.
Arriving at the drive.
Unloading ramp and Leitner-Poma operator house.
Top terminal overview.
Another view of the drive terminal.
Looking up at the drive station.
Side view of the return terminal.
Lift line.
View down the line on Al’s Run.
Advertisements

2 thoughts on “Lift 1 – Taos, NM

  1. Maxwell Uguccioni March 19, 2019 / 11:04 pm

    Why not a six-pack to keep the same capacity?

    Like

  2. V3 September 21, 2019 / 5:18 pm

    Capacity was not an issue the double only had around 900 pph and only ran occasionally, ride time, comfort and summer operations were big drivers for the upgrade.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s