Maillard Express – Le Massif, QC

This was the very first Canadian lift with UNI-G terminals in 2001. It has three of them!
Upper part of the lift line.
The 2001 expansion project also included a new summit lodge, access road and extension of the Baladeuse double chair.
Rare double combo assembly.
There is a mid-station approximately one third of the way up.
Loading only here.
The station can be bypassed by moving the heavy side assembly and sheaves onto the upper part of this tower.
Tunnel style station.
Lift line below the mid-station.
View up from the base.
Side view of the bottom terminal.
UNI-G return.
Lower station overview.
Tower 1.
Arriving at the mid station.
Half tower 10.
The light side bypasses this station.
Another look at the tunnel.
Arriving at the drive.
Side view of the top station.
Unloading area.
Doppelmayr Worldbook entry.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s