Middlefield – Powder Ridge, CT

This Partek-Borvig triple replaced a Hall double in 2001.
Sheaves integrated into the bottom station.
Motor room.
Lower part of the lift line.
Top unloading ramp.
The old Hall tension terminal behind the top station.
View from the summit.
Borvig return station.
Tower 11.
Middle part of the lift line.
Looking up the line.
Loading area.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s