New bottom drive-tension terminal.Bottom terminal.Looking up the line.Old drive terminal.New top terminal that replaced a tension terminal.Looking down from the top.Upper lift line.
I remember when Multorpor had the new drive installed and was shortened. I was in college at the time and skiing during winter break. They had not opened it yet because they still needed to complete the load test. I am pretty sure the drive replacement and shortening occured 2003. This will always be one of my favorite lifts. So many great memories riding it as a child with my family and continuing through years. Still love riding this lift.
Does this lift run
LikeLike
Yes.
LikeLike
The old drive terminal was destroyed by a tree in January.
LikeLike
Do you possibly have photos of the damage?
LikeLike
I can take some this weekend.
LikeLike
I remember when Multorpor had the new drive installed and was shortened. I was in college at the time and skiing during winter break. They had not opened it yet because they still needed to complete the load test. I am pretty sure the drive replacement and shortening occured 2003. This will always be one of my favorite lifts. So many great memories riding it as a child with my family and continuing through years. Still love riding this lift.
LikeLike