Partek replaced a Borvig double with this triple in 2014.The line is short with only four towers.Upper half of the lift line.A Partek tower with catwalks and lifting frame.T4.Fixed bullwheel up top.Lift overview.Unloading area.Tower 1 and the drive station.Loading area.
Are the tower tubes from the old double?
LikeLike