This lift is one of seven Vail Resorts ordered from Skytrac for the mid-Atlantic states in 2022.Arriving at the top terminal.Unloading area and Skytrac operator booth.Side view of the top terminal.Sheave assemblies integrated into the station.Monarch drive terminal with tensioning.Lift overview.Loading area.Tower 3 with night lighting.View back down the lift line.Tower 5.
how come they did not go with partek for this, seems like there would be better parts sharing with their other lifts
LikeLike