Ridge – Catamount, MA/NY

This base to summit lift came used from Belleayre.
The bottom terminal is a CTEC Enterprise model.
Looking down the lift line.
The last few towers.
Tower 19 shares a foundation with the top terminal.
Orion return.
Middle part of the lift line.
Lower line.
CTEC quad chairs.
Lift line seen from the parking lot.
Advertisements

One thought on “Ridge – Catamount, MA/NY

  1. Collin Parsons October 22, 2019 / 5:39 pm

    This was the Superchief fixed grip quad at Belleayre. It was built in 1999 and only operated 7 seasons before going detachable. Most of the tower tubes stayed at Belleayre and were reused on the detachable. This lift mostly reuses tower tubes from the Hall double it replaced. The others were either new or leftover tubes that Belleayre did not need in the conversion. At Belleayre, this lift would’ve had around 220 chairs based on the length, speed, and capacity. 104 were reused at Belleayre and the rest were sent here. The tower heads, line gear, drive, and return all came from Belleayre.

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s