School House – Marmot Basin, AB

A platter lift ran in this alignment until 2011, when it was replaced by the former Paradise triple.
Counterweight.
View up the lift line.
Looking down.
The drive-tension station.
Leaving the loading station.
Arriving at the return.
Top station and lift line.
The lift line has a very consistent pitch.
Doppelmayr sheave assemblies.
Middle section of the line.
Tower 8.
Top station and the unloading ramp.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s