Summit – Sugarbush, VT

The Summit quad opened in 1990, replacing a Stadeli double.
Poma Alpha drive station.
Side view of the bottom terminal.
Depression assemblies integrated into the lower station.
Tower 1.
Upper half of the line.
The top bullwheel on the summit of Mt. Ellen.
View down the line.
Side view of the return bullwheel.
Unloading ramp and top shack.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s