Sun – Bromley, VT

This lift initially continued to the top of Bromley but was shortened when the Sun Mountain Express was built. It often operates when the detachable can’t due to weather.
Fixed return bullwheel at the unload point.
Breakover towers.
Upper section of the lift.
The other side of these towers was never used.
View down the line.
Around half way, the sister lift, Alpine, ends.
View down from the top of Alpine.
Looking up from the top of the other side.
Another view down the lower line.
Loading area and drive station.
View up the line from the base area.
Lower terminal overview. The first two towers on each side are portals.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s