This lift services the skier’s right side of the mountain and was the first Borvig built at Buena Vista.Drive terminal and cover.Portal tower 1 at the load point.Lift overview.Unloading area.Snowflake bullwheel up top.View from the summit.Tower 4, actually the 5th tower.
Notice the rope tow pole next to the drive.
LikeLike