T-Bar – Summit Lake, BC

This short T-Bar services all of the terrain at Summit Lake.
Top terminal.
The unloading area is well below the top bullwheel.
The bottom terminal with diesel prime mover.
Drive bullwheel.
The lift line.
Doppelmayr carrier.
Breakover towers 4 and 5.
View down the lift line.
Unloading area.
Tower 3.
Doppelmayr tower built in 1979.
Lower station building.
Controls and bottom station.
Riding up the track.
Counterweight.
Another view of the top terminal.
Lift overview.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s