Teocalli – Crested Butte, CO

This was the first lift built by Vail Resorts at Crested Butte.

The alignment differs significantly from the previous double chair.

Monarch drive station.

Middle part of the lift line. 

Lower lift line. 

View up the line.

Lower terminal in the same location as the previous double.

View up from the bottom terminal. The old lift ran along the trees to the left.

Peak return station.

Loading area.

A Skytrac tower head with Leitner-Poma sheaves.

Breakover towers.

Tower 11.

The top terminal is right next to Red Lady Express. 

Unloading area.

The top half of the lift line is mostly flat.

The top of tower 12.

Upper lift line. 

A heavily loaded tower.

Riding up.

Skytrac quad chair without foot rests.

Middle part of the lift line.

Nearing the summit.

Tower 13.

View down near the summit.

This lift has quite a few combination assemblies.

The lift is very high off the ground in a few places.

View down.

2 thoughts on “Teocalli – Crested Butte, CO

  1. V3 December 20, 2019 / 11:32 pm

    This lift is a Monarch Standard not XT (you can tell by the space by the ladder) it also is the first Skytrac ordered by Vail resorts and the first Skytrac to have 4/4 combos. I had a nice time building it with Casey, Joe, Phil and Mike.

    Liked by 2 people

  2. Donald Reif December 21, 2019 / 9:24 am

    There are five combi towers on this lift: towers 2, 3, 6, 11, and 12. The only lift on the mountain with more combi towers than that is the Silver Queen Express lift with seven (6, 7, 11, 12, 15, 20, 21).

    Like

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s