This late model Mueller triple came used to Red from Big White.The lift opened a new expansion area called Topping Creek.The bottom drive terminal.Riding up the line.A Mueller triple chair with double grip.Nearing the summit.View back down the line.This lift has more towers than it did at Big White so a few new ones were manufactured.Fixed top bullwheel.Looking down the line with the original Red Mountain in the background.View down at tower 9.Upper part of the lift line.Lower lift line.View up near the bottom terminal.Lift overview.Arriving up top.Unloading area.Side view of the top bullwheel and idler sheaves.
Who manufactured the new towers?
LikeLike
Mueller Lifts. Scroll down to recent projects. https://mueller-lifts.com/
LikeLike
Seems like a very clean relocation. When riding the lift it seemed to be in really good condition as well.
LikeLike