Triple – Hunt Hollow, NY

This drive terminal was added in 1991 when the lift went from a double to a triple.
Lift overview.
Riding up.
Some towers are Hall with Hall sheaves while others are CTEC with CTEC sheaves.
A CTEC tower with Hall sheaves on one side and CTEC on the other.
The return terminal went mostly untouched during the renovation.
Upper terminal overview.
View down from the mid-station.
Lower part of the line.
Tower 1 and the bottom station.
View up at tower 3.
Arriving at the top terminal.
Another view of the tension system.
View from near the summit.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s