Wilderness – Bolton Valley, VT

The Wilderness double services the northern section of the mountain and is the longest lift at Bolton Valley. This midstation is near the summit.
View down from the mid.
Unload ramp number one.
Steep upper part of the lift.
Top tension station.
Unload ramp number two.
Tension carriage.
View down from the summit. The line is almost 5,000 feet long.
Side view of the mid unload.
Lower station with vault drive.
View up from the bottom terminal.
Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s