The Wilderness double services the northern section of the mountain and is the longest lift at Bolton Valley. This midstation is near the summit.View down from the mid.Unload ramp number one.Steep upper part of the lift.Top tension station.Unload ramp number two.Tension carriage.View down from the summit. The line is almost 5,000 feet long.Side view of the mid unload.Lower station with vault drive.View up from the bottom terminal.
There’s no snowmaking I believe on this pod of trails, so I’m wondering how often this runs? I’ve skied here once – this past season – and it was open but the terrain was sketchy….
Do you think you could get some winter shots?
LikeLike
There’s no snowmaking I believe on this pod of trails, so I’m wondering how often this runs? I’ve skied here once – this past season – and it was open but the terrain was sketchy….
LikeLike