This lift shares its first six towers with Lift 6.Unique double height adjustable bottom station.Lift line from below.Side view of the bottom station, in the process of getting hydraulic tensioning.Lift overview.Top drive station.Unload ramp.Lift line above where 6 ends.Top few towers.Top station and ‘Y’ style tower.In 2023, new owner Alterra shortened the 2 side of this lift to a beginner lift.The lift was shortened from 17 towers to only 8.Tower 7 acting only on the heavy side.The final tower on the shortened alignment.This drive terminal came from another lift.New drive.Look in the distance and you can still see the old top station.Updated configuration.
If you look closely in this picture you can see the Yan drive https://skiliftblog.files.wordpress.com/2017/10/img_1982.jpg
LikeLike
anyone here know when this lift last operated?
LikeLike
2017. Likely to be shortened this year and become a beginner lift. Operating fulltime in 2024.
LikeLike
Why it last operated in 2017 and why it being shortened? There already is a parallel beginner lift.
LikeLike
I heard 6 will be removed. The idea is that they do not need both lifts and a triple is better for lessons than a double.
I wouldn’t be surprised if 12 is removed as well.
LikeLike
Chairs 6 and 12 stays
LikeLike