News Roundup: Live Rescue

News Roundup: Fire Sale

News Roundup: Naming

News Roundup: 685 Cabins

  • New owners launch Granby Ranch Rising, a set of capital improvement initiatives.
  • Seven Springs’ new lift may be completed as soon as the end of this month.
  • Mexico City will launch the Doppelmayr-built Cablebús Line 1 on Sunday, followed by the Leitner-built Line 2 on July 24th with a system total of 13 stations, 121 towers and 685 cabins.
  • Mt. Hood Meadows proposes replacing the Mt. Hood Express with a Leitner-Poma six place in 2022 or 2023.
  • Lookout Pass begins cutting trails on Eagle Peak with installation of Sundance’s former Ray’s quad set to commence in 2022.
  • A Breckenridge developer proposes a short gondola to bring skiers from the Gold Rush parking lot to the BreckConnect Gondola.
  • Sunlight tables construction of the East Ridge expansion lift, citing “soaring costs of materials such as steel due to ongoing supply chain challenges.” The mountain says “new lift installations are happening at a premium price right now,” and will prioritize more immediate needs such as upgrades to existing lifts.
  • Speaking of premium lifts, more towers arrive for the Squaw-Alpine Base to Base Gondola.

News Roundup: Breaking Ground

Another Six Pack for Snowbasin

Utah’s Snowbasin Resort has partnered with Leitner-Poma of America for its next big project, a six place chair in Middle Bowl. The lift will replace Snowbasin’s oldest fixed grip, a 1979 CTEC triple. Together with the recently-built Wildcat Express, the new six pack will offer an attractive alternate route up the mountain to the Needles Gondola. Middle Bowl Express will be the first Leitner-Poma lift for Sinclair Oil Corporation, the parent of Snowbasin and Sun Valley.

“Middle Bowl is a legendary lift that runs through the heart of Snowbasin,” said Davy Ratchford, General Manager of Snowbasin Resort. “We are committed to our guest experience and advanced lift infrastructure, so we’re thrilled to provide this upgrade to improve our guests’ access to upper mountain skiing.”

According to planning documents submitted to Weber County, the new Middle Bowl will load to the north of the current base station and terminate above Needles Lodge, allowing more room for egress. It will rise 1,190 vertical feet over 4,803 feet of slope length and 18 towers. Initial capacity is planned at 1,800 passengers per hour with 51 chairs on the line. In the future, 17 carriers could be added to reach 2,400 skiers per hour. A ride up Middle Bowl will last just 4.9 minutes compared with 9.2 minutes on the old lift at full speed.

Leitner-Poma is currently looking for employees to help build the six pack beginning in mid-July through November.