This lift used to start where the snowmaking pipe crosses underneath in this picture. 7 towers were added in 2007.Bottom terminal in its new location.Another view of the base terminal.Drive terminal from above.Newer Doppelmayr CTEC tower.Split tower before the mid-station unload.Unloading ramp.Tower 20 looking down.Breakover towers.Fixed top terminal.Another view of the line.
Did they have to add more chairs as well?
LikeLike
Probably not. This isn’t the main lift on the Bear Peak side and I doubt it ever has a line anyways.
LikeLike
This is what the lift looked like when it started in its original location.
Here’s how that change looked on a map.
Before:
And after:
LikeLike