Avalanche – Beaver Valley Ski Club, ON

After decades buying from Doppelmayr, Beaver Valley switched to Leitner-Poma for this project in 2023.
This lift replaced a Skyway double that had been heavily modified by other manufacturers.
Z return station with loading conveyor.
Operator controls up top.
ABB drive.
AC motor on top of the gearbox.
Evac engine.
Controls in the machine room.
Lift overview.
Steep terrain in Avalanche Bowl.
Lift overview.
View riding up the line.
Tower 3.
View back down the line.
Arriving at the Alpha top drive.
Unloading area.
Side view of the drive terminal.
View from the summit.

Leave a comment