Beginner – Hatley Pointe, NC

This double chair was built using a mix of new and used parts.
Like the neighboring lift, this one was abandoned following a fire at the nearby upper day lodge.
Doppelmayr CTEC controls.
View from the drive terminal. Towers are older CTEC models.
Spring drive terminal slightly damaged by heat from the fire.
The short lift line.
Top terminal.
View down from the summit.
CTEC towers and chairs.
Unloading area.
The top terminal and operator house.
Lift overview.

8 thoughts on “Beginner – Hatley Pointe, NC

  1. Sam Altavilla's avatar Sam Altavilla November 1, 2019 / 9:04 am

    Sad to see a lift in disrepair like this. Any possibility that they will refurbish and sell it?

    Like

  2. skier72's avatar skier72 March 10, 2020 / 8:41 pm

    Such a sad looking lift. I hope someone can give it a new life, somewhere.

    Liked by 1 person

    • Asher's avatar Asher July 1, 2024 / 7:35 pm

      I agree here to I hope they don’t replace it with a new lift because lifts like this one are very rare now days

      Like

  3. Ethan's avatar Ethan January 24, 2022 / 6:20 pm

    I think that no one should leave a lift stay like this

    Liked by 1 person

  4. Ethan's avatar Ethan January 25, 2022 / 12:44 pm

    Agree with SKIER72 this lift needs a new life.Donald?

    Like

  5. Asher's avatar Asher July 1, 2024 / 7:30 pm

    yeah it’s sad I like those two ctec lifts there cool I hope they get them up and running some time soon but they do need a lot of TLC

    Like

  6. Alina Hollis's avatar Alina Hollis October 9, 2025 / 10:38 am

    This lift is freshly painted as of 2024! Word is that will be up and running this winter.

    Like

Leave a comment