This is the last remaining base-to-summit fixed grip at Granite Peak after the construction of three Leitner-Poma detachables.Unloading area.View from the summit.There is a mid-station with two separate ramps and seven towers.The second part of the mid-station is for loading.View up the last pitch.The first part of the mid-station is for unloading.Lower lift line.View up.The line.Unique Riblet motor room setup.Drive station with tensioning behind.Loading platform.Another view of the large drive terminal.
Looks like it was inspired by a Soviet Navy oil ship. In a good way.
LikeLiked by 1 person
Ha ha. There is a triple in South America that looks like this, but with garish colors. On Remontees-mecaniques.
LikeLike
Blitzen is one of Santa’s Reindeer.
LikeLike
This might be the most bizarre “modern” Riblet I’ve ever seen. Is this the only Riblet where the motor room is mounted on an overhead track?
LikeLike
I only filmed the upper part
LikeLike