Chair 4 – Cuchara, CO

This lift services intermediate terrain on the lower mountain.
As of mid 2020, this lift is in the process of being reactivated after 20 years unused.
Upper part of the lift line.
This was the first lift built at Cuchara.
Top station.
View from the summit.
Unloading ramp.
The first few towers.
Drive station with counterweight tensioning.
View up the line.
Tower 1.
Loading area.
Chairs stacked for repair.
Lift overview.

2 thoughts on “Chair 4 – Cuchara, CO

  1. Tyler Baroody's avatar Tyler Baroody July 23, 2022 / 5:24 pm

    June 2022 – 4 is operational!

    Liked by 1 person

  2. Ryan's avatar Ryan July 24, 2022 / 12:15 am

    what happened to the electrid drive? They can’t run that thing off of the back up engine forever and that Sheriff’s Department electric generator isn’t dedicated use for the lift.

    Like