This Mueller double only operates weekends and holidays because of its location on at the north end of the mountain.Lift overview.This lift was probably relocated from a larger ski area.View riding out of the base.Riding up the line.Hold down tower 4.Upper part of the lift line.View back down toward the river that carved the canyon.Breakover towers.Arriving at the prairie.Unloading area.Drive bullwheel.Double Mueller grip.
Relocated from Pigeon Mountain, Alberta in 1983
LikeLiked by 2 people