Double – Crystal Ridge, WI

This lift used to be paralleled by a Hall double but that lift was turned into a rope tow.
Loading area.
Borvig chairs were replaced by Partek.
Top terminal with snowflake bullwheel.
View down the line.
Towers 2 and 3.
The bottom terminal.
Side view of the small drive station.
Counterweight and lift line.

One thought on “Double – Crystal Ridge, WI

  1. RaflW's avatar RaflW September 1, 2025 / 7:38 am

    The base area flooded in the recent torrential rain event in greater Milwaukee (August 9-10, 2025). On facebook Crystal Ridge says they are replacing electrical systems that were damaged, and posted pics of new liftie shanks being built (and pics the base of this lift in feet of brown water!)

    Like

Leave a comment