Exhibition – Ski Sundown, CT

This quad replaced a Borvig triple for the 2024-25 season.
Ski Sundown self-installed the lift including a loading conveyor.
Top station in almost the same spot as the previous lift.
Unloading area and return bullwheel.
Top station with integrated sheave assemblies.
The lower station near the main lodge.
View up the line at tower 2.
Compression assemblies on tower 7.
View back down near the summit.
Looking up the line at tower 7.
Lower lift line.
Chairkit loading conveyor.
Tower 11.
View down the line at tower 7.
The first few towers.

Leave a comment