This base to summit quad was built in 1987 and runs more than 4,000 feet.Fixed return at the top of the mountain.Unloading area and top operator house.View from the summit without chairs on the line.Another view of the summit terminal.Looking down the long lift line.Tower 12.Middle segment of the line.View up at tower 7.The lift passes over a gully with an offset portal tower.Tower 5.Offset tower for the heavy side only.Lower lift line.Loading area and motor room.Lift overview.Chairs removed for a haul rope change.