Glacier Express – Whistler Blackcomb, BC

Whistler Trip 056
Tower 2.
This lift used to cross over a T-Bar called Horstman.
Whistler Trip 067
Drive terminal at Blackcomb Glacier.
Whistler Trip 071
Breakover towers and top station.
Whistler Trip 081
Top terminal from below.
Lift overview.
Lower station seen from Jersey Creme.
Upper half of the line seen from 7th Heaven.
Upper terminal aerial view.
View down the line.
Upper lift line with the Horstman T-Bar removed.
View down the steep part of the line.
The big bowl.
Lower line.
Side view of the early Uni terminal.
Loading area and maintenance rail.
Tower 1.
View riding out of Glacier Creek.
Looking back down.
Middle part of the line.
Breakover towers.
Exposed return bullwheel.

15 thoughts on “Glacier Express – Whistler Blackcomb, BC

  1. Donald M. Reif's avatar Donald M. Reif March 30, 2019 / 12:42 am

    Skyliner at Mount Bachelor has similar skins on its UNI terminals.

    Like

  2. Donald Reif's avatar Donald Reif November 11, 2020 / 7:54 pm

    I think this could be accurately described as a roller coaster lift.

    Like

  3. ivefs5's avatar ivefs5 November 19, 2023 / 5:03 pm

    A great lift w my fav terrain. Slightly unrelated but there is a lot of erosion on the terrain toward the bottom of the lift where they cut some of those runout areas. Not an expert here but the integrity of the skiing and of the mountain would be better managed if they put some investment into environmental remediation

    Like

  4. Rich V's avatar Rich V February 23, 2024 / 3:43 pm

    It looks like new footings are in place between the lift towers. Is this lift going to be replaced next summer?

    Like

      • WH2Oshredder's avatar WH2Oshredder February 23, 2024 / 6:42 pm

        Is Jersey Cream going to be a D-Line like Fitz or a standard UNI-G, I imagine UNI-G because Vail would go for the cheaper option.

        Like

        • FlyballSkiLifts's avatar FlyballSkiLifts February 23, 2024 / 6:52 pm

          UNI-G

          Like

        • WH2Oshredder's avatar WH2Oshredder February 23, 2024 / 7:40 pm

          thanks

          Like

  5. Skiing is cool's avatar Eli Burr June 14, 2024 / 8:41 pm

    I will not lie, I do think D-Line lifts look good but i’ve always loved the UNI-G terminals. i just think they look better in the right colors lol

    Liked by 2 people

  6. GearJammer's avatar GearJammer January 22, 2025 / 3:43 pm

    Glacier Express has been down for several days. Not sure if mechanical, terrain or staffing issues….

    Like

  7. Aussierob's avatar Aussierob January 22, 2025 / 4:27 pm

    Seems to be a gearbox bearing. Not definitive yet.

    Like

  8. Jiayin Chen's avatar Jiayin Chen January 29, 2025 / 7:22 pm

    IDK if this will help but I looked on the mountain cam and there were no chairs on line. Probably has nothing to do with the issue though.

    Like

    • Aussierob's avatar Aussierob January 29, 2025 / 11:51 pm

      The chairs are removed and the line de-tensioned so we can drop the bullwheel.

      Like

  9. skiliftycolton's avatar skiliftycolton February 1, 2025 / 6:36 pm

    Glacier express has been closed for almost 2 weeks due to a gearbox failure.

    Like

  10. skilift lover's avatar skilift lover April 10, 2025 / 11:57 pm

    Stunning photos, Peter!

    Like

Leave a comment