This lift replaced two aging fixed grips in a new alignment for the 2025-26 season.View from the summit toward Duluth and Lake Superior.Looking down the line at tower 5.Steep upper part of the line.Lift overview.One of five Alphas built in 2025, most of which are blue.Tower 2 with a large foundation due to bedrock.Omega style chair.Tower 6.Arriving at the top terminal.Middle section of the short line.Tower 2.Bottom station overview.Loading area and motor room.Drive desk controls.Small Allen-Bradley touchscreen.Evacuation drive.AC electric motor.Controls in the motor room.Gearbox.View up from the motor room.