This Skytrac quad replaced a Riblet double on the east side of Stevens Pass for the 2023-24 ski season.Lower terminal in the base area.Loading area and lift line.Drive bullwheel.The lower station in orange and beige.View from the summit.Tower 12.T13 and the top terminal.Upper station overview.Top bullwheel.View from the summit.Middle section of the lift line.View down the line.View up at tower 4.Tower 2.Lift line overview.Tower 2 adjacent to the lower station.Lift overview.
I’ve yet to see the lift run at 450fpm. Seems standard operating speed is more like 350fpm. Based on GPS & timing ride (6:15 ride time). I only tested because it feels so much slower than the old chair.
I’ve yet to see the lift run at 450fpm. Seems standard operating speed is more like 350fpm. Based on GPS & timing ride (6:15 ride time). I only tested because it feels so much slower than the old chair.
LikeLike